High resolution modular heating for soil evaporative desorption

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9636723
SERIAL NO

14488318

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a method and a system of high resolution modular heating for soil evaporative desorption. In one embodiment, a soil box comprising contaminated soil is mounted within a treatment chamber. Heated gas are directed into the soil box through a plurality of injection ports. A heat front from the heated gas desorbs the surrounding contaminated soil. The delivery of the heated gas may be in sections and independently controlled among the plurality of injection ports. A bottom section of the soil box is heated prior to a top section to minimize or reduce condensation formation within lower areas of the soil box, thereby creating roadways of desiccated, heated, and/or cracked soil at the bottom section. Vaporized contaminants from the top section is able to flow freely through the roadways to get to an exit pathway at the bottom of the soil box.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACADIA WOODS PARTNERS LLC77 BEDFORD ROAD KATONAH NY 10536

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brady, Patrick Richard Sisters, US 16 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00