Circuits and methods providing clock frequency adjustment in response to supply voltage changes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9634676
APP PUB NO 20170005665A1
SERIAL NO

14789095

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, systems, and circuits for providing compensation for voltage variation are disclosed. A system includes: a voltage comparator configured to assert a control signal in response to detecting that one or more of power supply voltages droops below a threshold amount; a phase locked loop (PLL) configured to divide an output frequency for the PLL in response to the assertion of the control signal; a plurality of voltage sensors corresponding to the plurality of power supply voltages, the voltage sensors configured to output respective digital signals indicative of a voltage level of its corresponding power supply voltage; and a control circuit configured to control an oscillator frequency in the PLL during the open-loop mode responsive to the respective digital signals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALCOMM INCORPORATED5775 MOREHOUSE DRIVE SAN DIEGO CA 92121

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pedrali-Noy, Marzio San Diego, US 29 447
Swaminathan, Ashok Cardiff, US 22 136
Venerus, Christian San Diego, US 5 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00