Energy transforming unit for distance measurement sensor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9634543
APP PUB NO 20140197643A1
SERIAL NO

14098866

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The subject invention relates to an air spring (1) with a distance measurement sensor (100), an energy transforming unit (200), a first mounting element (10) being adapted for being mounted to a first vehicle portion (2) and a second mounting element (20) being adapted for being mounted to a second vehicle portion (3). An air volume (50) is arranged between the first mounting element and the second mounting element. The energy transforming unit is adapted to transform a transition of the air spring from a first state (s1) of the air spring to a second state (s2) of the air spring into electrical energy and to provide the generated electrical energy to the distance measurement sensor. The energy transforming unit is arranged in the air volume (50) of the air spring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFINITY ENGINEERED PRODUCTS LLC3524 SOUTHWESTERN BOULEVARD FAIRLAWN OH 44333

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
May, Lutz Berg, DE 59 547

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00