Low temperature ohmic contacts for III-N power devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9634107
SERIAL NO

14285080

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to a method for manufacturing an Au-free ohmic contact for an III-nitride (III-N) device on a semiconductor substrate and to a III-N device obtainable therefrom. The III-N device includes a buffer layer, a channel layer, a barrier layer, and a passivation layer. A 2DEG layer is formed at an interface between the channel layer and the barrier layer. The method includes forming a recess in the passivation layer and in the barrier layer up to the 2DEG layer, and forming an Au-free metal stack in the recess. The metal stack comprises a Ti/Al bi-layer, with a Ti layer overlying and in contact with a bottom of the recess, and a Al layer overlying and in contact with the Ti layer. A thickness ratio of the Ti layer to the Al layer is between 0.01 to 0.1. After forming the metal stack, a rapid thermal anneal is performed. Optionally, prior to forming the Ti/Al bi-layer, a silicon layer may be formed in contact with the recess.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMEC3001 LEUVEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Jaeger Brice Leuven, BE 7 52
Decoutere, Stefaan Leuven, BE 13 87
Stoffels, Steve Leuven, BE 9 30
Van, Hove Marleen Blanden, BE 7 98

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00