Powder supply device and powder supply method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9631869
SERIAL NO

14241236

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A powder supply device 1 includes a powder feed pipe, at least part of which is an expansion/contraction part, a load cell, a pressure indicator, and a controller, wherein the controller obtains a powder weight or a rate of change in powder weight in the feed tank by using a value obtained by subtracting a value proportional to the pressure in the expansion/contraction part from the load applied by the feed tank to the load cell and adding a value proportional to a rate of change in pressure in the expansion/contraction part, and controls the flow rate of the powder to be fed to the outside of the feed tank by using the powder weight or the rate of change in powder weight.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTRIC POWER DEVELOPMENT CO LTD15-1 GINZA 6-CHOME CHUO-KU TOKYO 1048165 JAPAN
DIAMOND ENGINEERING CO LTDMINATO-KU TOKYO 108-0075

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kasagi, Fumihito Toyama, JP 4 29
Shimono, Kimihiro Toyama, JP 4 29
Shiraishi, Osamu Fukuoka, JP 6 25
Takeda, Takahiro Toyama, JP 57 907
Tamamura, Takushi Tokyo, JP 1 7
Teraoka, Kazutoshi Toyama, JP 4 29
Yasutomi, Toshinori Fukuoka, JP 20 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00