One-piece integrated chain snubber and oil diverter for a transaxle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9631715
APP PUB NO 20170108111A1
SERIAL NO

14887683

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transaxle for a vehicle has a case adapted to retain a transaxle oil. A chain transfers torque between transaxle gears, and a snubber is disposed along the tension side of the chain. The snubber comprises a molded base plate with a pair of mounting inserts extending transverse to the base plate to mount the snubber to a case of the transaxle. A snubber plate is integrally molded with the base plate and extends substantially transversely from a longitudinal side of the base plate to frame an edge of the chain. A ramp plate is integrally molded with the base plate and extends substantially transversely from the base plate and obliquely with respect to the snubber plate. A scoop is integrally molded with the base plate and extends from the ramp plate configured to transversely deflect a flow of transaxle oil directed to the scoop by the ramp plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLC1 AMERICAN RD FL4 DEABORN MI 48126-2701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arcota, Srinivas V Northville, US 1 8
Heuver, Bradley R South Lyon, US 13 45
Steward, Mark Ann Arbor, US 7 49
Yasnogorodskiy, Vladimir Sterling Heights, US 14 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00