Operating method for a production line with prediction of the command speed

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9630227
APP PUB NO 20130054003A1
SERIAL NO

13696376

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Before a first strip point is fed into a production line, an actual energy content at a location in front of the production line and a setpoint energy content at a location behind the production line are received for a first strip point, second strip point, and third strip point. The third strip point, followed by the first strip point, followed by the second strip point, are fed into the production line. A command variable for the first strip point and second strip point(s) is determined prior to feeding in the first strip point. Each command variable is determined based on (a) the actual value and the setpoint value of the strip point currently entering the production line, and (b) the actual value and the setpoint value of at least one strip point having already entered.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRIMETALS TECHNOLOGIES GERMANY GMBHBUNSENSTRASSE 43 ERLANGEN 91058

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Weinzierl, Klaus Nürnberg, DE 41 206

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00