Method for the formation of multi-layer paint films

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9630212
SERIAL NO

13265988

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a multi-layer paint film comprising coating an aqueous first colored base paint (A) on an electro-deposition paint cured paint film to form a first colored base paint film, coating an aqueous second colored base paint (B) on the first colored base paint film without preliminary heating of the first colored base paint film to form a second colored base paint film, coating a clear paint (C) coated on the second colored base paint film after preliminary heating of the first paint film and second paint film to form a clear paint film, and heating and curing the three paint films at the same time, wherein a talc pigment is included in each of paint (A) and paint (B) in an amount of from 1 to 5 mass % with respect to the total resin solid fraction of each of paint (A) and paint (B).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF JAPAN LTD6-10-1 ROPPONGI TOKYO 106-6121

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koga, Kazuhi Hiroshima, JP 14 85
Maekawa, Masazumi Yokohama, JP 1 5
Mizuno, Shigeyuki Yokohama, JP 3 5
Nakano, Sakura Hiroshima, JP 11 50
Tsukamoto, Eishi Yokohama, JP 5 18
Yamane, Takakazu Hiroshima, JP 48 257

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00