catalyst for tri-reforming of methane and a process for preparation thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9630167
APP PUB NO 20160296917A1
SERIAL NO

15093984

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a Ni nano-cluster supported on MgO—CeO2—ZrO2 catalyst and processes the production of the catalyst. Further, the present invention discloses use of Ni nano-cluster supported on MgO—CeO2—ZrO2 catalyst for the synthesis gas (a mixture of CO and H2) by tri-reforming of methane. The process provides a direct single step selective vapor phase tri-reforming of methane to synthesis gas over NiO—MgO—CeO2—ZrO2 oxide catalyst between temperature range of 600° C. to 800° C. at atmospheric pressure. The process provides a methane conversion of 1-99% with H2 to CO mole ratio of 1.6 to 2.3.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COUNCIL OF SCIENTIFIC & INDUSTRIAL RESEARCHANUSANDHAN BHAWAN 2 RAFI MARG NEW DELHI 110001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bal, Rajaram Dehradun, IN 13 14
Bordoloi, Ankur Dehradun, IN 9 9
Kumar, Manoj Dehradun, IN 337 4728
Pendem, Chandrashekar Dehradun, IN 11 11
Singha, Rajib Kumar Dehradun, IN 9 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00