Antenna structures and methods thereof for determining a frequency offset based on a measured data

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9627753
SERIAL NO

14285262

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system that incorporates the subject disclosure may include, for example, a circuit for determining a magnitude difference between a first signal supplied to an antenna and a second signal radiated by the antenna, determining a phase difference between the first signal supplied to the antenna and the second signal radiated by the antenna, measuring a change in reactance of an antenna, detecting an offset in an operating frequency of the antenna based on one of the magnitude difference, the phase difference, the change in reactance, or any combination thereof, and adjusting a resonant frequency of the antenna to mitigate the offset in the operating frequency of the antenna. Other embodiments are disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SKYCROSS CO LTD#1001 UNIT-C (YEUNGTONG-DONG DIGITAL EMPIRE BUILDING) 1556-BEONJI DEOKYOUNG-DAERO YEUNGTONG-GU SUWON-SI GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Caimi, Frank M Vero Beach, US 86 2892
Chen, Li Melbourne, US 997 9317
Kishler, Mark W Rockledge, US 34 606
Montgomery, Mark T Melbourne Beach, US 69 1371
Rabe, Duane Hawthorn Woods, US 14 419

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00