Method and device for assigning surplus slabs in the slab yard before hot rolling process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9626638
SERIAL NO

14810343

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for assigning surplus slabs in slab yards to orders includes loading slab pre-yards of a plurality of production lines with surplus slabs, describing the assignment of the surplus slabs to the orders with a mathematical model, grouping order data and slab data based on steel grades, obtaining an assignment scheme for the surplus slabs and the orders in each group with a mixed scatter search algorithm, and assigning the surplus slabs to the orders using the assignment scheme. If a surplus slab is in a pre-yard of a production line associated with an order the surplus slab is assigned to, the slab is moved using a crane to the production line. Otherwise, the slab is moved to the pre-yard associated with the production line, and then moved using a crane to the production line. The slab is then heated and rolled by the production line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORTHEASTERN UNIVERSITYNO 195 CHUANGXIN ROAD HUNNAN DISTRICT SHENYANG CITY LIAONING PROVINCE SHENYANG CITY LIAONING PROVINCE 110169

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meng, Ying Shenyang, CN 22 30
Tang, Lixin Shenyang, CN 23 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00