Multi-activity pipe-laying vessel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9625057
SERIAL NO

14651758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pipe-laying vessel has a bow, a stern and a weather deck therebetween, with a moonpool passing through the weather deck. The vessel includes an S-lay pipe deployment facility located below the weather deck, having a main firing line extending along a centerline of the vessel and a pipe assembly factory for assembling single lengths of pipe to form pipe assemblies and introduce them into the firing line for deployment from the vessel. The vessel further includes a J-lay pipe deployment facility for deploying pipe through the moonpool, the J-lay pipe deployment facility including a tower located above the moon pool and pipe handling equipment for delivering pipe assemblies from the firing line to the tower. The moonpool is located to one side of the firing line. By virtue of this configuration a relatively compact structure can be achieved whereby minimal length and width dimensions for the vessel are achievable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANGHAI ZHENHUA HEAVY INDUSTRIES CO LTD200125 NO 3261 DONGFANG ROAD SHANGHAI PUDONG NEW AREA SHANGHAI CITY SHANGHAI CITY 200125

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inbona, Yves Pierre Raymond London, GB 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00