Direct graphene growth on metal oxides by molecular epitaxy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9624600
APP PUB NO 20140332915A1
SERIAL NO

14362619

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Direct growth of graphene on Co3O4(111) at 1000 K was achieved by molecular beam epitaxy from a graphite source. Auger spectroscopy shows a characteristic sp2 carbon lineshape, at average carbon coverages from 0.4-3 monolayers. Low energy electron diffraction (LEED) indicates (111) ordering of the sp2 carbon film with a lattice constant of 2.5 (±0.1) Å characteristic of graphene. Six-fold symmetry of the graphene diffraction spots is observed at 0.4, 1 and 3 monolayers. The LEED data also indicate an average domain size of ˜1800 Å, and show an incommensurate interface with the Co3O4(111) substrate, where the latter exhibits a lattice constant of 2.8 (±0.1) Å. Core level photoemission shows a characteristically asymmetric C(1s) feature, with the expected lr to lr* satellite feature, but with a binding energy for the three monolayer film of 284.9 (±0.1) eV, indicative of substantial graphene-to-oxide charge transfer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF NORTH TEXASP O BOX 305250 DENTON TX 76203-5250

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kelber, Jeffry A Denton, US 12 71

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 18, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00