Construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9623746
APP PUB NO 20160152131A1
SERIAL NO

14951633

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tank bracket (23) is formed by a bottom surface part (24) having a first frame body (24A), a second frame body (24B), a third frame body (24C), and a fourth frame body (24D), a first side surface part (25) supported by the first frame body (24A) of the bottom surface part (24) and provided in a vertical direction, and a second side surface part (26) supported by the second frame body (24B) and provided in the vertical direction, and a female screw hole (24E) is provided in the bottom surface part (24). A fixing band (28) for fixing a reduction agent tank (22) is provided on the tank bracket (23). On this, the tank bracket (23) is fixed to an undercover (14) of a revolving frame (5) by using each of the female screw holes (24E) of the bottom surface part (24) in a state in which the reduction agent tank (22) is sandwiched between the second side surface part (26) and a right side frame (11) of the revolving frame (5).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTD16-1 HIGASHIUENO 2-CHOME TAITO-KU TOKYO 1100015 JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Azuma, Hiroyuki Ushiku, JP 32 292
Fujii, Toshinori Tsukuba, JP 6 47
Mano, Hidenori Tsukuba, JP 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00