Method of surface modification of alumina

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9623399
APP PUB NO 20140369922A1
SERIAL NO

14476762

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of surface modification of an alumina carrier. The method includes: 1) dissolving a soluble kazoe in deionized water to yield a kazoe aqueous solution; 2) submerging an alumina carrier in the kazoe aqueous solution and drying the alumina carrier in a vacuum environment; 3) placing the dried alumina carrier in a reactor, adding silicon tetrachloride and Grignard reagent dropwise to the reactor, sealing the reactor and heating it to a constant temperature, and maintaining the constant temperature for between 3 and 18 hours, where a volume ratio of the added silicon tetrachloride and the alumina carrier is between 0.5:1 and 5:1, the constant temperature is controlled to be between 160 and 350° C.; and 4) cooling the reactor, filtering, washing, and drying the alumina carrier in the vacuum environment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNSHINE KAIDI NEW ENERGY GROUP CO LTD430223 KATIE BUILDING NO 1 JIANGXIA ROAD EAST LAKE NEW TECHNOLOGY DEVELOPMENT ZONE WUHAN HUBEI WUHAN CITY HUBEI PROVINCE 430223

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Song, Dechen Wuhan, CN 14 7
Zhan, Xiaodong Wuhan, CN 21 162
Zheng, Shenke Wuhan, CN 5 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00