Semiconductor device and method of manufacturing a semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9620616
APP PUB NO 20150137184A1
SERIAL NO

14582583

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a semiconductor device includes laminating and forming an electron transit layer, an electron supplying layer, an etching stop layer, and a p-type film on a substrate sequentially, the p-type film being formed of a nitride semiconductor material that includes Al doped with an impurity element that attains p-type, the etching stop layer being formed of a material that includes GaN, removing the p-type film in an area except an area where a gate electrode is to be formed, by dry etching to form a p-type layer in the area where the gate electrode is to be formed, the dry etching being conducted while plasma emission in the dry etching is observed, the dry etching being stopped after the dry etching is started and plasma emission originating from Al is not observed, and forming the gate electrode on the p-type layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRANSPHORM JAPAN INCSHIN-YOKOHAMA CENTER BLDG 9F 2-5-15 SHIN-YOKOHAMA KOHOKU-KU YOKOHAMA KANAGAWA 222-0033

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nukui, Kenji Nakano, JP 7 120
Yamada, Atsushi Isehara, JP 406 3161

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00