Horizontally deployable smoke/fire curtain assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9616260
SERIAL NO

14749473

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A barrier assembly comprising a horizontally deployable vapor barrier assembly with a frame with opposing side guides extending between a header and footer. A guide rod contained in each side guide extends between the header and the footer. A vapor barrier is deployable horizontally with side edge sleeve portions that slide axially over the guide rods. At least one roller is connected to each of the side guides adjacent to the guide rod, and each roller supports a portion of the vapor barrier's side edge portions. The rollers rolls on the edge portions as the sleeve portion slides axially over the guide rods as the vapor barrier moves between the deployed and stowed positions. Lifter plates are attached to each of the side guides and positioned to engage support carriages and temporarily lift the support member out of engagement with the support surface over segment joints as the vapor barrier moves between the stowed and deployed positions. A drive system moves the vapor barrier between the stowed and deployed positions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SMOKE GUARD INC287 N MAPLE GROVE BOISE ID 83704

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chubb, Alexander Engsan Sydney, AU 1 0
Lawry, Brendan William Sydney, AU 1 0
Todd, Christopher Gordon Dennis Beaconsfield, AU 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00