Scheduling request transmission method and apparatus for decoupled downlink-uplink

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9615379
SERIAL NO

14437582

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This disclosure provides a Scheduling Request transmission method (10) for decoupled downlink-uplink in heterogeneous network, where the heterogeneous network comprises at least two cells in charge of downlink and uplink transmission separately and connected with any backhaul, the method comprising: determining (11) a positive Data Scheduling Request, D-SR, is to be transmitted in a current D-SR's subframe together with HARQ-ACK/NACK on PUCCH using PUCCH format 1a/1b/3; transmitting (12) a HARQ-ACK/NACK in the current D-SR's subframe on PUCCH together with a negative D-SR using PUCCH format 1/1a/1b or format 3 while transmitting a Scheduling Request, SR, in a next SR's subframe subsequent to the current D-SR's subframe. In this method, the Scheduling Request (SR) of the UEs can be correctly detected in the Pico base station to trigger UL transmission in decoupled UL/DL scenario in various case and any kinds of backhaul can be supported.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TELEFONAKTIEBOLAGET L M ERICSSON (PUBL)164 83 STOCKHOLM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lu, Qianxi Beijing, CN 546 3695
Zhao, Zhenshan Beijing, CN 355 667

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00