High outlet density power distribution unit
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Apr 4, 2017
Issued Date -
N/A
app pub date -
Apr 9, 2015
filing date -
Nov 6, 2012
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
Systems and apparatuses are provided in which outlets are coupled to a power distribution unit (PDU) or PDU module in various configurations. The outlets may be coupled to a recessed surface within a PDU housing. The outlets and recessed surface may be formed as part of a single mold. The outlets may be coupled to a printed circuit board that is at least partially disposed within the PDU housing. The outlets may extend away from the recessed surface or printed circuit board towards or beyond a front face of the PDU housing.
First Claim
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
LEGRAND DPC LLC | 60 WOODLAWN STREET WEST HARTFORD CT 06110 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Irons, Travis | Reno, US | 44 | 375 |
# of filed Patents : 44 Total Citations : 375 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Oct 4, 2028 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Legal Events

Matter Detail

Renewals Detail
