High performance Ziegler-Natta catalyst systems, processes for producing such catalyst systems, and use thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9611340
APP PUB NO 20140357815A1
SERIAL NO

14287489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A catalyst system for the polymerization of olefins may include a first solid catalytic component and a second solid catalytic component. The first solid catalytic component may include: a spherical MgCl2-xROH support; a group 4-8 transition metal; and a diether internal electron donor. The second solid catalytic component may include: a spherical MgCl2-xROH support; a group 4-8 transition metal; and a diether internal electron donor. The first solid catalytic component produces a propylene homopolymer having a Xylene Solubles (XS) value of greater than 2 wt %; and the second solid catalytic component produces a propylene homopolymer having a XS value of less than 2 wt %. The second catalytic component may act as an external electron donor during use, and embodiments herein do not require use of any additional external electron donors to control polymerization and reliably vary the properties of the resulting polymer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LUMMUS NOVOLEN TECHNOLOGY GMBH68165 MANNHEIM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Denkwitz, Yvonne Mannheim, DE 7 16
Schuster, Oliver Weinheim, DE 22 134
Winter, Andreas Neuleininger, DE 220 6188

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00