Pneumatic tube delivery system having transport characteristics responsive to payload item-acquired
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Apr 4, 2017
Grant Date -
N/A
app pub date -
Mar 14, 2014
filing date -
Mar 15, 2013
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A method for transporting items via a delivery system includes identifying an item to be transported via the delivery system by acquiring identifying information from an identifying element applied to the item, determining an item-specific transport characteristic of the item based on the acquired identifying information and setting parameters for a transport of the item based on the transport characteristic of the item.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
PEVCO SYSTEMS INTERNATIONAL INC | 1401 TANGIER DRIVE BALTIMORE MD 21220 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Dahl, Steven | Baltimore, US | 4 | 23 |
# of filed Patents : 4 Total Citations : 23 | |||
Powder, William Cooke | Baltimore, US | 1 | 4 |
# of filed Patents : 1 Total Citations : 4 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 4 Citation Count
- G06F Class
- 14.60 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Oct 4, 2028 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
