Blow molding device and a method for manufacturing a container

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9610744
APP PUB NO 20140367895A1
SERIAL NO

14369598

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To regulate, in blow molding device using liquid, such as beverage, cosmetic product, and pharmaceutical product, filled in final product as pressurized liquid, head space in container which is filled with content liquid during molding to be predetermined volume, provided is blow molding device including blow nozzle configured to tightly communicate with mouth tubular portion of preform. In state where rod is disposed to be inserted into blow nozzle and where tip portion of rod is inserted into preform, pressurized liquid is supplied into preform via tubular introduction path formed by blow nozzle and rod, thereby expandingly shaping container in accordance with cavity of metal mold. When container is shaped and supply of pressurized liquid is stopped, rod is disinserted from container, and according to shape and insert position of tip portion of rod, head space of shaped container that is filled with liquid is regulated to be predetermined volume.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DISCMA AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagashima, Takeshi Tokyo, JP 23 406
Sato, Sumito Tokyo, JP 11 105
Tamura, Nobuyuki Tokyo, JP 32 302

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00