Control system and control method for controlling a switching device integrated in an electronic converter and switching cell comprising said system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9608620
APP PUB NO 20160308525A1
SERIAL NO

15101191

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a control system and control method for controlling a switching device (1) integrated in an electronic converter, the object of which is to extend the working voltage range of the switching devices and thus increase the power of the electronic DC/AC converter which prepares the energy produced by a energy generating system and injects it into the electrical grid. It basically comprises a voltage source (3), a capacitance (7), a first gate resistor (21) and a second gate resistor (22), a first circuit formed by a series resistor (6) with a first diode (5), a second circuit formed by a second diode (4) and a connecting element (8) controlled by a control unit (12) that controls the opening and closing thereof. Another object of the present invention is a switching cell for an electronic converter comprising said control system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INGETEAM POWER TECHNOLOGY S A48170 ZAMUDIO (BIZKAIA)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balda, Belzunegui Julian Sarrigueren, ES 5 15
Gonzalez, Senosiain Roberto Sarriguren, ES 7 40
Perez, Nicuesa Luis Sarriguren, ES 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00