Switch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9607793
APP PUB NO 20150287558A1
SERIAL NO

14430951

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switch includes a fixed contact part including a fixed contact, a movable contact part including a movable contact, a control button, an operation part including a first end and a second end, and a lock. When the first end is pressed, the control button is pressed by the operation part, the movable contact touches the fixed contact, and the switch becomes an ON state. While the movable contact and the fixed contact are in contact with each other, a first protrusion of the lock touches an engaging part of the control button to limit movement of the control button and maintain the ON state. When the second end is pressed, the operation part touches a second protrusion of the lock and moves the lock in such a direction that the first protrusion moves away from the engaging part, and the switch becomes the OFF state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJITSU COMPONENT LIMITEDTOKYO
NTT FACILITIES INC3-4-1 SHIBAURA MINATO-KU TOKYO 108-0023

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beak, SeungSeok Tokyo, JP 16 51
Hirose, Keiichi Tokyo, JP 31 309
Kiryu, Koichi Nagano, JP 60 1689
Noritake, Masatoshi Tokyo, JP 8 18
Yuba, Takashi Tokyo, JP 80 751

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00