System and method for harvesting rainwater

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9605417
APP PUB NO 20140144835A1
SERIAL NO

14091368

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for harvesting rainwater for use in a skirt building. The skirt building includes a main building and a podium supporting the main building. The system includes: a standpipe; a buffer channel; a filter channel; and a green roof. The green roof includes a vegetation region including a baffled diversion corridor, and a bottom filtering layer including a drainage pipe. The standpipe is arranged on the main building and is connected to the buffer channel where the energy of rainwater flowing out of the standpipe is dissipated. The buffer channel, the filter channel, and the green roof are arranged on the podium, and the buffer channel communicates with the filter channel. The filter channel is connected to the green roof. The filter channel is divided into a plurality of sections respectively filled with different matrix materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHONGQING UNIVERSITY400044 NO 174 POSITIVE STREET SHAPINGBA DISTRICT CHONGQING CHONGQING CITY CHONGQING CITY 400044
PROMOTION CENTRE OF SCIENCE AND TECHNOLOGY DEVELOPMENT MINISTRY OF HOUSING AND URBAN-RURAL DEVELOPMENT OF THE PEOPLE'S REPUBLIC OF CHINANO 9 SANLIHE STREET HAIDIAN DISTRICT BEIJING 100000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bao, Yanrong Chongqing, CN 2 4
Chai, Hongxiang Chongqing, CN 14 29
Guo, Luwei Chongqing, CN 3 6
Li, Shen Chongqing, CN 112 645
Wang, Weijie Chongqing, CN 84 469
Zhang, Feng Beijing, CN 1002 28040
Zhao, Hua Beijing, CN 34 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00