Method for manufacturing bicycle cogset

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9604699
SERIAL NO

14527916

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bicycle cogset manufacturing method includes: connecting a first and a second sprocket in different sizes with connecting members as a sprockets assembly in advance, where first and second inner portions of the first and second sprockets respectively have first insertion and second insertion members, and each of the insertion members are respectively provided with a first and a second positioning hole; transferring the sprockets assembly into a mold, and performing pouring to form a sprocket base, where an assembly hole is disposed in the center of the sprocket base, a plurality of connecting arms are arranged on an outer portion of the sprocket base, and the connecting arms clad the first insertion members and the second insertion members to form a cogset. In this way, modularization can be implemented to achieve objectives of preventing troublesome riveting, accelerating manufacture, and reducing product weight.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TIEN HSIN INDUSTRIES CO LTDNO 6 WUGONG 8TH RD WUFENG DIST TAICHUNG CITY 41353

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liao, Wen-Nan Taichung, TW 2 52
Tsai, Wen-Feng Taichung, TW 19 218

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00