Wet process of fabricating fiber wall panels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9604393
SERIAL NO

13019315

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention discloses a wet process of fabrication of fiber wall panel, which includes the following steps: 1) slurry making: mix nontimber type natural plant fiber slurry with grass family slurry according to 1:0˜1.5 dry weight ratio, and add water to dilute this slurry; 2) slurry storage: pour the mixed slurry into slurry storage tank and add water for dilution; 3) suction straining and forming: pour slurry into mold cavity for cold pressing, dewatering, and forming, to yield wet blanks; 4) hot pressing, forming, and drying: move the Wet blanks to the hot pressing mold for hot pressing and remove moisture generated during hot pressing, to yield fiber wall panel. Fiber Wall panel made by this process features environment friendliness and high strength.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING UNIVERSITY OF TECHNOLOGY DAFENG INSTITUTE OF MARINE INDUSTRYDAFENG PORT ECONOMIC DEVELOPMENT ZONE DAFENG PORT YAN CHENG JIANGSU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Jishuang Jiansu, CN 1 2
Qin, Zuodong Jiangsu, CN 8 4
Tang, Zhirong Zhejiang, CN 29 236
Xu, Miaofang Zhejiang, CN 1 2
Zhang, Lin Zhejiang, CN 453 3838
Zhou, Renni Zhejiang, CN 1 2
Zhou, Ying Zhejiang, CN 191 1432

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00