Device for producing artificial snow, and method for producing artificial snow

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9599390
APP PUB NO 20150053785A1
SERIAL NO

14467815

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for producing artificial snow includes: elements (100) for producing a central jet (101) consisted by a first fluid chosen among air or water; elements (110) for producing a peripheral jet (111) consisted by a second fluid chosen among water or air and different from the first fluid; and nucleation elements (120) for the production of at least one nucleation jet (121). The elements for producing the central jet and the elements for producing the peripheral jet are arranged in such a manner that the opposite contours (103, 114) of their respective jets each define a generating line, which opposite generating lines extend parallel or at least approximately parallel to each other; moreover, the nucleation elements (120) are distributed over the external periphery of the elements (110) for producing the peripheral jet (111).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNOALPIN FRANCE SAS3 CHEMIN DU JUBIN DARDILLY F-69570

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
David, Eric Treillieres, FR 9 69
Galvin, Michel Carquefou, FR 8 72
Terrabona, Karlheinz Marebbe/Enneberg- Corte/Hof, IT 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00