Female screw member, motor operated valve using the same, and method for producing female screw member for motor operated valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9599230
APP PUB NO 20140319391A1
SERIAL NO

14324782

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A female screw member includes a female screw part with a female screw, and a projection part projecting in the direction of a center shaft of the female screw and having a working face in the rotating direction centering on the center shaft. The female screw part and projection part are integrally molded with a resin. The projection part has a spiral inclination face spirally inclining by one round from the working face centering on the center shaft of the female screw. The height H of the working face is equal to or smaller than a pitch P of the female screw. Using the projection part as a fully opening fixing stopper, a motor operated valve includes a valve main body having a valve seat, the female screw member attached to the valve main body, a motor having a rotator and stator, and a valve shaft. The valve shaft is screwed to a female screw of the female screw member, and is rotated and driven by the rotor, and has a fully opening movable stopper capable of contacting the fully opening fixing stopper.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIKOKI CORPORATION17-24 TODOROKI 7-CHOME SETAGAYA-KU TOKYO 158-0082

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ohuchi, Tomoari Tokyo, JP 6 49
Suganuma, Takeshi Tokyo, JP 13 216

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00