Rotating magnetic field downhole power generation device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9598937
APP PUB NO 20140251592A1
SERIAL NO

14241903

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a downhole rotating magnetic field generator, wherein a stator assembly is formed by fixedly connecting a guiding stator, windings, and a body together, and a rotor assembly is formed by mounting a turbine rotor and a permanent magnet together. Between the stator assembly and the rotor assembly, sliding bearings are arranged and small mud passages are formed. There is no metal isolation between the rotor and the stator for cutting through the magnetic lines of force, so that the eddy current loss is relatively small. Meanwhile, with mud flowing through the passages as lubricant, overheating of the generator can be prevented and high power output can be ensured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA PETROLEUM & CHEMICAL CORPORATIONBEIJING 100728
SHENGLI DRILLING TECHNOLOGY RESEARCH INSTITUTE OF SINOPECNO 827 BEIYI ROAD DONGYING CITY 257017

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Wei Shandong, CN 2011 24064
Han, Laiju Shandong, CN 6 25
Li, Zuohui Shandong, CN 7 20
Liu, Qinglong Shandong, CN 13 12
Lv, Zhenhua Shandong, CN 66 211
Sun, Feng Shandong, CN 45 485
Wang, Yifeng Shandong, CN 70 188
Xu, Fengling Shandong, CN 1 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00