Device for compensating for ripples of output voltage of PFC converter and battery charging device for electric vehicle using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9597964
APP PUB NO 20150224885A1
SERIAL NO

14377144

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for compensating ripples in the output voltage of a PFC converter and a battery charging device for an electric vehicle are disclosed. The disclosed device for compensating the ripples included in the output voltage of a PFC converter includes: a first switching element having one end connected with an output terminal that is not connected with a ground from among two output terminals forming an output end of the PFC converter; a second switching element having one end connected with the other end of the first switching element and having the other end connected with a ground; a compensation inductor having one end connected with the other end of the first switching element and with one end of the second switching element; and a compensation capacitor having one end connected with the other end of the compensation inductor and having the other end connected with a ground.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MYONGJI UNIVERSITY INDUSTRY AND ACADEMIA COOPERATION FOUNDATION(MYONGJI UNIVERSITY NAM-DONG) 116 MYONGJI-RO CHEOIN-GU YONGIN-SI GYEONGGI-DO 17058

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Won-Yong Gyeonggi-do, KR 9 65
Lee, Jun-Young Gyeonggi-do, KR 131 864
Yoo, Gwang-Min Seoul, KR 2 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00