Device and method for measuring mass flow rate of fluids

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9593978
APP PUB NO 20140122008A1
SERIAL NO

13660107

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a device and method for measuring a mass flow rate of a fluid, a housing has two hollow pipes communicating with one another and having a fluid inlet and a fluid outlet, an electromagnetic excitation unit excites vibrations in the hollow pipes, two electromagnetic adapters are associated correspondingly with the two pipes and provides signals which are proportional to a speed of vibrations of the pipes of said housing, and an electronic block connected with the electromagnetic excitation unit and with the electromagnetic adapters determines a mass flow rate of a fluid, a correction associated with inclusions in the fluid and constituted by a ratio of a voltage amplitude of the adapters and a voltage amplitude of excitation of vibrations by the electromagnetic excitation unit, and a corrected mass flow rate of the fluid based on the determined mass flow and the determined correction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARGOSY TECHNOLOGIES73221 HAYSTACK ROAD PALM DESERT CA 92660

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dondoshansky, Alexander Moscow, RU 1 1
Mouler, Peter Irvine, US 10 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00