Cooling unit cooling swirler vane of combustion burner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9593852
APP PUB NO 20140331680A1
SERIAL NO

14340245

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion burner including a fuel nozzle, a burner tube that surrounds the fuel nozzle to form an air passage between the burner tube and the fuel nozzle, swirler vanes that are arranged in a plurality of positions in a circumferential direction on an external circumferential surface of the fuel nozzle, each of which extends along an axial direction of the fuel nozzle, and gradually curves from upstream to downstream, a liquid fuel injecting hole that is formed on the fuel nozzle, and from which a liquid fuel is injected to a vane pressure surface of each of the swirler vanes, and a cooling unit that cools a part of the vane pressure surface on which the liquid fuel hits. The cooling unit injects a mixed fuel prepared by mixing water and the liquid fuel evenly from the liquid fuel injecting hole to the vane pressure surface of the swirler vane.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD3-1 MINATOMIRAI 3-CHOME NISHI-KU YOKOHAMA 220-8401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishizaka, Koichi Hyogo, JP 23 206
Saito, Toshihiko Hyogo, JP 172 2927
Tanimura, Satoshi Hyogo, JP 62 723

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00