Process for the production of optimised liquefied lignocellulosic substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9593355
APP PUB NO 20140377812A1
SERIAL NO

14364081

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention concerns a production of liquefied lignocellulosic substrate by enzymatic reaction. 10% to 40% by weight dry matter of pre-treated lignocellulosic substrate is contacted, with water and enzymes at 0.1 to 60 mg of enzymes per gram of cellulose for a period of 1 to 24 hours. Over time, at least the value of one of the rheological characteristics of the reaction medium is measured. If a reduction of the value is detected over time, the following step a) is carried out:

    a) the feeding flow rate of pre-treated lignocellulosic substrate is increased, with or without modification of the flow rate of enzymes and/or water;If an increase of the value is detected over time, a step b) is carried out:b) the feeding flow rate of water and/or enzymes is increased, with or without modification of the flow rate of pre-treated lignocellulosic substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INSTITUT NATIONAL DE LA RECHERCHE AGRONOMIQUE;AGRO INDUSTRIE RECHERCHES ET DEVELOPPEMENTS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Louret, Sylvain Lyons, FR 19 126
Rousset, Romain Lyons, FR 9 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00