Power line network apparatus, system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9590698
SERIAL NO

14665847

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various aspects of the instant disclosure are directed towards a method for communicating time-based data in a power line communication system. In accordance with one or more example embodiments, firmware is downloaded to a multitude of endpoints over power distribution lines carrying alternating current (AC) power. Endpoint devices targeted for changes to stored firmware are grouped and the firmware is delivered in chunks to each group. As devices receive a particular chunk of firmware, the device advances to a next stage and provides information indicative of this stage, based upon which subsequent chunks of firmware are communicated. This occurs (e.g., on a daily cycle) until the endpoint has received all firmware for an update, after which the endpoint(s) are re-started using the firmware. Accordingly, such updates can be carried out in a cyclic and verifiable manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LANDIS+GYR TECHNOLOGIES LLC6436 COUNTY ROAD 11 PEQUOT LAKES MN 56472

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Christiansen, Scott H Brainerd, US 6 15
Duff, John F Breezy Point, US 8 38
Flen, Rolf Pequot Lakes, US 10 35
Johnson, Roland Breezy Point, US 16 226

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00