Reversible fuel cell and reversible fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9590262
APP PUB NO 20140234734A1
SERIAL NO

14348666

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reversible fuel cell includes a positive electrode containing manganese dioxide, a negative electrode containing a hydrogen storage material, a separator disposed between the positive electrode and the negative electrode, and an electrolyte. Each of the negative electrode and the positive electrode is an electrode for power generation and is also an electrode that applies electrolysis to the electrolyte using electric current to be fed from the outside. This cell is capable of storing electric energy to be supplied at the time of overcharge by converting the electric energy into gas, and is also capable of reconverting the gas into electric energy in order to utilize the electric energy. Accordingly, there are provided a reversible fuel cell and a reversible fuel cell system each of which is excellent in energy utilization efficiency, energy density and load following capability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNIVERSITY OF TOKYO3-1 HONGO 7-CHOME BUNKYO-KU TOKYO 1138654 ?1138654
EXERGY POWER SYSTEMS INCBUNKYO-KU TOKYO 113-0033

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsutsumi, Atsushi Tokyo, JP 19 109
Tsutsumi, Kaduo Tokyo, JP 7 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00