Method and apparatus for detecting and compensating measurement errors due to transformer saturation in a meter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9588149
APP PUB NO 20160003873A1
SERIAL NO

14792544

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A current measurement circuit includes an integrator, first and second transformers, and a current measurement unit. The first transformer includes a first winding about a magnetic core. The magnetic core has an opening through which a current to be measured passes. The first winding is configured to generate a first current based on a first flux in the magnetic core. The second transformer includes second and third windings. The second winding is coupled to receive the first current from the first winding. The second winding has a terminal coupled to the third winding. The third winding is coupled to a first input of the integrator circuit. The output of the integrator circuit is operably coupled to provide an error current to the second transformer. The current measurement unit measures the current through the second winding of the second transformer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LANDIS+GYR LLC2800 DUNCAN ROAD LAFAYETTE IN 47904

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boudreau,, Jr Frank J Otterbein, US 14 34
Kraus, Matt E Jamestown, US 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00