Enhanced turndown process for a bitumen froth treatment operation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9587177
SERIAL NO

14114323

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

More particularly, the model was a dynamic simulation built in HYSYS™ v7.1. The component slate was simplified and selected to give a vapor and two liquid phases, and have the ability to measure an S/B ratio. All the unit operations were included and modeled as best fit within HYSYS™. Pumps were all modelled as standard HYSYS™ centrifugal pumps with performance curves, settlers were modelled as vertical 3-phase vessels with internal weir enabled—the overflow side of the weir is used to simulate the overflow vessels on the settlers. All proposed controllers were included with generic tuning parameters, which control the system process variable (PV) to match a set point (SP). The control algorithm incorporated master PV controllers such as S/B ratio to relate froth and solvent flows and maintain relative material balance relationship between the process streams involved. In this specific simulation, the solvent flows were assigned a slave relationship relative to the bitumen flow; that is, the solvent controller SP was reset based on the bitumen froth flow and the master S/B ratio.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORT HILLS ENERGY L PC/O FORT HILLS ENERGY CORPORATION P O BOX 2844 150-6TH AVENUE S W CALGARY AB T2P 3E3

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grappolini, Benjamin John Calgary, CA 2 11
Hann, Thomas Onoway, CA 6 37
Van, Der Merwe Shawn Calgary, CA 24 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00