Water condensate capture from datacenter power generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9585291
APP PUB NO 20130333405A1
SERIAL NO

13527580

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Water condensate is captured from the exhaust of a generator utilized to provide power to a data center, and the captured water is then utilized for data center purposes such as adiabatic cooling. The exhaust of electrical power generators is passed through a condenser to obtain water condensate from such exhaust. The water condensate is stored in water storage units and is utilized to provide supplemental cooling to the data center. Sporadic usage of water can enable the water storage to be refilled between uses, since water condensate can be obtained from exhaust almost continuously. The level of water is monitored and the level of processing performed by the data center is adjusted to avoid emptying such water storage units. Historical climatological data is utilized to estimate the water required. Additionally, short and long-range weather forecasts can be optionally taken into account.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICROSOFT TECHNOLOGY LICENSING LLCONE MICROSOFT WAY REDMOND WA 98052

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Belady, Christian L Mercer Island, US 220 5227
James, Sean M Olympia, US 26 522

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00