Hybrid heating apparatus applicable to the moving granular bed filter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9585199
APP PUB NO 20150117845A1
SERIAL NO

14066880

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structure of hybrid heating equipment according to the present invention is disclosed. The present invention combines a multiple of the thermal sources for heating the interior materials of the container simultaneously, and assures the materials could gain the thermal energy uniformity. Furthermore, the present invention allows users to control the level of the heating simply through adjusting the length of interior heating elements or the flow rate of the incoming gas. In addition, the present invention connect with the tubes of the hot exhaust gas to further lower the influence of the thermal resistance by coordinating the flow of the hot exhaust gas, therefore fully reflect the advantages of the conserving energy and reducing the carbon emissions by reusing the waste heat as the principal source while the electric heating devices as supplement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ATOMIC ENERGY COUNCIL-INSTITUTE OF NUCLEAR ENERGY RESEARCHNO 1000 WUNHUA RD JIAAN VILLAGE LONGTAN TOWNSHIP TAOYUAN COUNTY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Po-Chuang Taoyuan County, TW 13 19
Chen, Yi-Shun Taoyuan County, TW 26 123
Chyou, Yau-Pin Taoyuan County, TW 41 282
Li, Shu-Che Taoyuan County, TW 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00