Power transmission belt, in particular toothed belt, and method for the production thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9581219
APP PUB NO 20120142471A1
SERIAL NO

13398311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power transmission belt (20) having an elastic main body (17) includes a top layer as the belt backing and a bottom section having a power transmission zone. The power transmission zone and/or the top layer has/have a coating (15, 16), characterized in that the coating (15, 16) of the power transmission zone and/or the top layer includes at least the following layer construction: a base coating (18) made of a textile material, wherein the base coating (18) forms a bond with the elastic main body (17) and has a surface coating (19) including at least a mixture A, which contains at least one reactive diluent as per DIN 55945:2007-03. The invention further relates to a method for producing such a power transmission belt. The novel coating concept is applicable in particular in a toothed belt.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONTITECH DEUTSCHLAND GMBHCONTINENTAL-PLAZA 1 30175 HANNOVER 30175

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baltes, Thomas Hannover, DE 5 69
Gaska, Roman Sehnde, DE 3 3
Mahnken, Claus-Lueder Ahausen, DE 9 19
Teves, Reinhard Seelze, DE 20 231
Unruh, Axel Hannover, DE 4 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00