Wind turbine blade and manufacturing method thereof
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Feb 28, 2017
Grant Date -
Aug 21, 2014
app pub date -
Dec 30, 2013
filing date -
Feb 18, 2013
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A manufacturing method of a wind turbine generator includes a cutting step of cutting a base blade at m cutting planes into (m+1) sections where m is an even number, the m cutting planes being at different positions in a blade length direction; and joining step of joining (m/2+1) sections of the (m+1) sections together to obtain a wind turbine blade which is shorter than the base blade, the (m/2+1) sections including a blade-root section which is closest to a blade root and a blade-tip section which is closest to a blade tip, the blade-root and blade-tip sections being non-adjacent to each other.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
MITSUBISHI HEAVY INDUSTRIES LTD | TOKYO JAPAN TOKYO METROPOLIS |
International Classification(s)

- 2013 Application Filing Year
- F03D Class
- 666 Applications Filed
- 577 Patents Issued To-Date
- 86.64 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Fukami, Koji | Tokyo, JP | 20 | 134 |
# of filed Patents : 20 Total Citations : 134 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- F03D Class
- 17.82 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 28, 2028 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Matter Detail

Renewals Detail
