Frame for hydraulic apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9579863
SERIAL NO

15292137

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A frame for a hydraulic apparatus includes at least two supporting pillars parallel to each other, a supporting assembly mounted on the at least two supporting pillars, and a link mechanism mounted on the supporting assembly and coupling the core plate to the adjustable die plate. The supporting assembly includes a fixed die plate, an adjustable die plate slidably, and a core plate. The fixed die plate includes a periphery sidewall and a surface perpendicular to the periphery sidewall, the fixed die plate defines a ring-shaped indentation in the surface and extending along a circumferential direction of the fixed die plate, the fixed die plate further defines at least two first through openings interconnected with the ring-shaped indentation and cut through the periphery sidewall.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN JINGJIANG YUNCHUANG TECHNOLOGY CO LTD518109 FOXCONN SCIENCE PARK NO 2 EAST RING ROAD LONGHUA STREET LONGHUA DISTRICT SHENZHEN CITY GUANGDONG PROVINCE SHENZHEN CITY GUANGDONG PROVINCE 518109

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Tang-Quan Shenzhen, CN 5 0
Jiang, Yi-Min Shenzhen, CN 35 150
Li, Jun-Qi Shenzhen, CN 33 62
Yuan, Xiao-Bo Shenzhen, CN 16 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00