Power allocation method for transmitting scalable video over MIMO system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9578604
APP PUB NO 20150358919A1
SERIAL NO

14519286

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power-allocation method for scalable video transmission over MIMO system includes: encoding a video sequence into L layers; performing MCSs to the layers and estimating bit error rate or symbol error rate respectively for each of the layers after MCSs procedure based on channel quality feedbacks from the receiver side; performing power allocations of L sub-problems and obtaining candidate power allocation solution of each of the sub-problems respectively based on bit error rate or symbol error rate of each of the layers and derivative of bit error rate or symbol error rate of each of the layers; and choosing one of the candidate power allocation solution with the largest quality of experiences as the power allocation of the scalable video transmission over MIMO system. This invention considers transmission-error-rate of PHY layer and video coding structure of APP layer and optimizes quality of experiences at user end with cross-layer design.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL SUN YAT-SEN UNIVERSITYNO 70 LIEN-HAI ROAD KAOHSIUNG 80424

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Xiang Kaohsiung, TW 396 1198
Hwang, Jenq-Neng Kaohsiung, TW 7 152
Lee, Chung-Nan Kaohsiung, TW 4 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00