System and method for a load anticipation feature and its tuning method for a generating set

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9574511
APP PUB NO 20160025023A1
SERIAL NO

14718504

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method, system and computer software for providing a load anticipation feature for a diesel generating set including a diesel engine, a generator, a speed governor, and an automatic voltage regulator generator in a power system and computer data processor apparatus and computer executable instructions for ascertaining an equivalent linear speed control system whose response approximately matches the non-linear speed response of the diesel generating set; ascertaining at least one programmable parameter of the load anticipation feature based on a real power load applied to the diesel generating set and a desired speed response of the linear speed control system; generating a control output based on a measured real power load and at least one programmable parameter of the load anticipation feature; the speed governor receiving the control output and adjusting the speed of the diesel engine based on the control output.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASLER ELECTRIC COMPANY12570 STATE ROUTE 143 HIGHLAND IL 62249

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burnworth, Jeffrey A Swansea, US 3 51
Kim, Kiyong Collinsville, US 41 221

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00