Wet start-up method for hydrogenation unit, energy-saving hydrogenation process and hydrogenation apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9574141
APP PUB NO 20140124408A1
SERIAL NO

14068506

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a wet start-up method for hydrogenation unit, an energy-saving hydrogenation process, and a hydrogenation apparatus. The method involves heating a start-up activating oil to a specific temperature and flowing the heated oil through a bed of hydrogenation catalyst bed, so that the temperature at the catalyst bed layer is increased to 180±10° C. or above by means of heat exchange and the reaction heat generated from activation in the start-up method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA PETROLEUM & CHEMICAL CORPORATIONNO 22 CHAOYANGMEN NORTH STREET CHAOYANG DISTRICT BEIJING 100728
FUSHUN RESEARCH INSTITUTE OF PETROLEUM AND PETROCHEMICALS SINOPECNO 31 DANDONG ROAD WANGHUA DISTRICT FUSHUN LIAONING PROVINCE 113001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fang, Xiangchen Liaoning, CN 18 20
Guo, Rong Liaoning, CN 27 198
Han, Zhaoming Liaoning, CN 2 6
Li, Benzhe Liaoning, CN 1 2
Liu, Jihua Liaoning, CN 23 72
Liu, Tao Liaoning, CN 613 3850
Peng, Chong Liaoning, CN 54 49
Sun, Shike Liaoning, CN 2 2
Zeng, Ronghui Liaoning, CN 5 5
Zhang, Xuehui Liaoning, CN 21 191

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00