Rotor core of dynamoelectric machine and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9570964
APP PUB NO 20120153769A1
SERIAL NO

13328325

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rotor core includes a rotor core includes a plurality of rotor core blocks each of which is constituted by stacking annular sheet-like core materials in a direction of sheet thickness of each core material and a plurality of catch recesses circumferentially disposed in an inner circumference of each core material at an interval of a predetermined angle so as to extend radially outward, the catch recesses having respective circumferential dimensions equal to each other and different radial depths. In each rotor core block, a plurality of the core materials is stacked while the catch recesses having an identical configuration are aligned. The rotor core blocks have respective outer peripheries which are shifted from each other according to the depths of the catch recesses caught by a bar-shaped aligning jig when the catch recesses of the rotor core blocks are caught by the aligning jig.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOSHIBA INDUSTRIAL PRODUCTS MANUFACTURING CORPORATION2121 OAZANAO ASAHI-CHO MIE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaito, Takeo Mie, JP 3 5
Kasuya, Tomotoshi Mie, JP 1 0
Yoshida, Toshiyuki Mie, JP 63 799

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00