Electrical contact materials and method for preparing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9570207
APP PUB NO 20150155066A1
SERIAL NO

14535060

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are electrical contact materials and a method for preparing the same. The electrical contact material includes (i) one or more kinds of metals selected from the group consisting of silver (Ag), copper (Cu) and gold (Au), and an alloy of nickel (Ni); and (ii) carbon nano tubes (CNTs) coated with Ag nanoparticles, Ag plated CNTs, or Ag nanowires, or (i) one or more kinds of metals selected from the group consisting of Ag, Cu, Ni and Au; (ii) a metal oxide that is cadmium oxide, indium oxide, tin oxide, zinc oxide or mixture thereof; and (iii) CNTs coated with Ag nanoparticles, Ag plated CNTs, or Ag nanowires. Accordingly, it is possible to reduce the content of high-priced Ag and to obtain excellent electrical and mechanical properties.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESEARCH & BUSINESS FOUNDATION SUNGKYUNKWAN UNIVERSITYCORPORATE COLLABORATION CENTER SUNGKYUNKWAN UNIVERSITY 2066 SEOBU-RO JANGAN-GU GYEONGGI-DO SUWON-SI 16419
LSIS CO LTDSOUTH KOREA GYEONGGI DO ANYANG ANYANG GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baik, Seung Hyun Seoul, KR 4 2
Lee, Dong Mok Suwon-si, KR 11 59
Park, Ki Hun Cheongju-si, KR 23 14
Sim, Jeong Hyeon Hwaseong-si, KR 2 2
Song, In Chan Seoul, KR 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00