Systems and methods for regulating an alternative energy source that is decoupled from a power grid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9568900
APP PUB NO 20140163754A1
SERIAL NO

13836376

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes: determining a total power load from an electrical power consumption entity configured to receive all or a portion of the total power load from each of (i) an alternative energy source (“AES”), (ii) a power grid, and (iii) a rechargeable energy storage device. The AES and the power grid are connected using a reverse power relay. The method also includes: for a first time period, determining a first power supply from the AES. The first power supply is affected by natural events that are uncontrolled by a user. The method also includes in accordance with a determination that, during the first time period, the power supply from the AES exceeds the power load: storing an excess portion of the power supply in the energy storage device, without releasing electrical power from the AES to the power grid. The excess portion is less than the energy storage device's maximum capacity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENGIE SERVICES U S INC12980 FOSTER STREET SUITE 400 OVERLAND PARK KS 66213

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alegria, Eduardo Alberto San Mateo, US 3 44
Mineai, Aaron San Francisco, US 2 24
Potter, David San Francisco, US 70 2422

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00