Flow-control assembly comprising a turbine-generator cartridge

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9567962
APP PUB NO 20140041623A1
SERIAL NO

14112046

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flow-control assembly may include a fluid conduit and a flow-control valve in the fluid conduit. The flow-control assembly may further include a fluid expansion conduit with an inlet defined at least in part by the fluid conduit and configured to selectively receive flow of a fluid from the fluid conduit. The fluid expansion conduit may further include an outlet in fluid communication with the fluid conduit downstream of the flow-control valve. A rotating fluid expander in the fluid expansion conduit may be configured to expand the fluid and thereby rotate and in some embodiments generate electricity. In a first position flow is substantially blocked. In a second position flow is allowed through the fluid expansion conduit. In a third position flow through the fluid conduit is allowed without necessarily passing through the fluid expansion conduit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JPMORGAN CHASE BANK N A AS ADMINISTRATIVE AGENT383 MADISON AVE 5TH FLOOR NEW YORK NY 10179

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beresewicz, Patrick La Mirada, US 12 109
Guidry, Mike Redondo Beach, US 16 170
Reyenga, James William Long Beach, US 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00